ELECTRICAL

View Building Electrical Load Summary Chart

Existing Systems
The existing buildings are provided with 277/480V electrical services. Several of the original buildings are serviced from a common service located on the east side of the campus adjacent to Receiving. These services are supplied and separately metered by Salt River Project. The locations of these services and their sizes versus the location and size of the new buildings planned preclude the use of these services for the new buildings. New services should be provided for each of the new buildings.

Basis for Evaluations
The specific requirements for each building will not be defined at this time. Therefore, for the purpose of estimating building loads and to evaluate the adequacy of existing building capacity, the following assumptions were considered:

1. 25% of each classroom/lab building will be a "Lab", i.e. science "type", computer, etc.
2. Every classroom is fully mediated.

Basis for Estimated Electrical Loads
The estimated electrical loads are based on the recently completed Maricopa Community College projects including the Red Mountain Campus of Mesa Community College. The electrical loads for various building types are based on the following:

Building Type Total Load @ 480/277V Load @ 120/208V
Classroom/Administration 20 VA/GSF 10 VA/GSF
Classroom/Multipurpose 21 VA/GSF 11 VA/GSF
Classrooms/Laboratories 24 VA/GSF 14 VA/GSF


12.47 kV Electrical Distribution System
Salt River Project (SRP) provides power to the Pecos Campus. An existing 12.47 kV underground lines runs north from Pecos Road up both the east and west sides of the campus to supply power to the existing buildings. This 12.47 kV distribution system will have to be extended to provide power to the new buildings. SRP will require that a loop be provided through the campus to increase reliability. The drawing on the previous page shows a proposed route for this loop. Once design work is started, SRP will require review of the proposed design before detailed design begins. SRP typically provides the conductors, manholes and 12.47 kV terminations. CGCC will provide the trenching, conduit and equipment pads.

It should be noted that the new Wellness Center is proposed to be located above two of the existing 12.47 kV feeders on the east side of the existing campus. These two feeders will have to be relocated.

Scope of Work & Related Costs

  1. New Buildings: As stated above, new buildings will be provided with new 277/480V service entrance sections supplied directly from the APS 12.47 kV distribution system. Lighting and mechanical equipment will be supplied from the 480V distribution system and 120/208V loads will be supplied through a system of 480-120/208V transformers and panel boards.
  2. Site Electrical Utility Modifications and Additions: It is estimated that approximately 3,500 linear feet of trenching and conduit will be required to extend the existing underground 12.47 kV feeders, complete the loop required by SRP, and install conduit to the new buildings. In addition approximately 6 new manholes will be required. The cost for conduit, trenching and equipment pads is approximately $100 per linear foot so that total cost for underground work is $350,000. Since all of the buildings are new loads on the SRP system, fees to provide service by SRP should not be significant, and no allowance is included here.



CGCC Logo